Return to previous page
DETAILED SPECIFICATIONS
PIERCE TRANSIT
ELEVATOR MAINTENANCE

This is summary information only. If you would like to be added to the
bidders list to receive the complete bid package when it is open for
receiving bids, please fill out the form at the bottom of this page.

SCOPE OF WORK
The contractor shall perform monthly periodic inspections and services on each elevator and associated machinery in accordance with the elevator manufacturer’s recommendations and shall include the applicable items listed under preventative maintenance. The contractor will carry out other period tests as required by the Washington State Department of Labor and Industries for the particular type of elevators. The contractor will provide 24-hour emergency call out service to make repairs as required. All work to be accomplished in accordance with American Society of Mechanical Engineers (ASME) standard A17.1 and all federal, state and local laws, in particular Washington State RCW 70.87 and WAC 296-96.

TERM OF CONTRACT
The term of the contract shall be from December 1, 2006 - November 30, 2009, with two optional one-year periods upon mutual agreement by both parties.


Please Send Me The Complete Bid Package
If the bid is not currently open for receiving bids, your name will just be added to
the bidders list at this time. You will not receive anything until the bid is advertised
unless you request to receive the last bid package in the comment field.

Please provide us with all the information so that we may contact
you if there are any addendums to these specifications.

Attention:
Company:
Address:
Address:
City:    State:     Zip:  
Phone No:    Fax No:     E-Mail:  
Comment:
Please send by:  E-Mail   USPS Mail
 
  
Return to previous page